Sheikh Khalifa Bridge, Abu Dhabi, United Arab Emirates - The large spans in the middle bridge sections were concreted by means of the balanced cantilever method.

Sheikh Khalifa Bridge
Abu Dhabi, United Arab Emirates

Connection between Abu Dhabi City and Saadiyat Island

Length: 1,455 m

Width: 60 m (one of the widest bridges in the world)

 

 

Location
Project participants
Customer: ARGE Ed. Züblin AG, Saif Bin Darwish Engineering Contractor

The Project

Impressions from the project process

Project Information

statement-sheikh-khalifa-bridge-peri-formwork
statement-sheikh-khalifa-bridge-peri-formwork
Jens Nagel
Deputy Project Manager | Site Manager
From PERI, we are used to getting reliability - for the technical support and the systems. The formwork solution used with VARIO and raised formwork units is extremely stable and the PERI UP modular scaffold is easy to install and flexible in use. The moving procedure is carried out with large-sized transportable units. With the PERI formwork solution for the cantilevered construction, it was possible for us to minimize the work involved for adapting to the different bridge cross-sections from cycle to cycle.

Related Products

Interested in learning how PERI can support your next project?

Call us on +971 (0) 4 326 2992 to discuss your requirements further.

Location

Sheikh Khalifa Bridge, United Arab Emirates

Sheikh Khalifa Bridge, Abu Dhabi, United Arab Emirates - The large spans in the middle bridge sections were concreted by means of the balanced cantilever method.
Sheikh Khalifa Bridge, Abu Dhabi, United Arab Emirates - The large spans in the middle bridge sections were concreted by means of the balanced cantilever method.