Part of the 80,000 sqm slab to be poured using PERI SKYDECK, the lightweight slab formwork.
United Arab Emirates

Badr Project
Dubai, United Arab Emirates

11 commercial / residential low-rise buildings

Floors: ranging from 3 to 7

GF: 80,000 m/ Typical floor: 3,000 - 5,000 m2

Construction period: 2016 - 2018 | 24 months

                           

Location
Project participants
Customer: Engineering Contracting Co.

The Project

Impressions from the project process
Nasser Nasser - Construction Manager at ECC for Al Badr project with PERI
Nasser Nasser - Construction Manager at ECC for Al Badr project with PERI
Nasser Nasser
Construction Manager
The reason we chose to work with PERI on this project is the practical and high quality aspect of the products. SKYDECK is ideal for slabs as it is independent of a crane, especially for big areas like this one. LICO is the best choice for columns as it is highly economical and we were able to save on plywood costs. Also the cooperation with the sales and supervision team on site was excellent.

Related Products

Interested in learning how PERI can support your next project?

Call us on +971 (0) 4 326 2992 to discuss your requirements further.

United Arab Emirates

Badr Project

Part of the 80,000 sqm slab to be poured using PERI SKYDECK, the lightweight slab formwork.
Part of the 80,000 sqm slab to be poured using PERI SKYDECK, the lightweight slab formwork.