The cost-effective shoring for slab tables and high loads

PD 8 Shoring System

The cost-effective shoring for slab tables and high leg loads

The cost-effective shoring for slab tables and high leg loads

Overview

PD 8 Shoring is predestined for use under slab tables – in particular, due to its large spindle extensions, the system can be quickly adapted to accommodate different slab heights as well as being lowered for moving under large beams.

The PD 8 is a cost-effective system for the erection of supporting frame structures in formwork construction. The frames consist of welded, fully galvanized tubular steel framework elements and are supplemented with spindles at the head and base thus forming rectangular or square shoring towers or suspended shear frames that can be joined together. Thereby, the basic dimensions under the slab tables range from 1.50 m x 1.25 m up to 1.50 m x 3.50 m. The shoring system can be used with up to 73 kN per leg for high leg loads and for large room heights. All heights can be incrementally realized using just the Frames R 150 and R 110 and spindles. The two frames are tightly connected to each other by means of diagonal bracing.

Quickly and continuously adaptable
with only 2 frame heights and large spindle extensions

High load-bearing capacity
with up to 73 kN leg load and for large slab heights

Large units easily moved
horizontally with a Trolley and Winch, and vertically using the Lifting Fork


PD 8 Shoring System in action

Your benefits at a glance
  • PD 8 II

    The cost-effective shoring for slab tables and high loads

  • PD 8 IV

    With the frame heights R 150 and R 110, as well as the large spindling lengths, each height is continuously adjustable up to the maximum.

  • PD 8 III

    The PERI PD 8 slab table and shoring tower are type-tested.

  • PD 8: The PD 8 stair tower can be erected up to a height of 100 m.
    The PD 8 stair tower can be erected up to a height of 100 m.
  • PD 8 I

    10.50 m high PD 8 slab tables with SRZ steel walers as main beams and VT 20 as cross beams for construction of a warehouse.

  • PD 8: Cost-effective use of the PD 8 for construction of a motorway bridge.
    Cost-effective use of the PD 8 for construction of a motorway bridge.
  • PD 8: Complicated PD 8 falsework with inclined concrete surfaces for constructing a shopping centre.
    Complicated PD 8 falsework with inclined concrete surfaces for constructing a shopping centre.
  • PD 8: PD 8 slab tables with 2 x GT 24 main beams and GT 24 cross beams.
    PD 8 slab tables with 2 x GT 24 main beams and GT 24 cross beams.
  • PD 8: Optimal height adjustment with PD 8 frames R 150 and R 110 for a bridge superstructure.
    Optimal height adjustment with PD 8 frames R 150 and R 110 for a bridge superstructure.
  • PD 8 slab tables moved with the Lifting Fork 1.75 t / 8.0 m.
    PD 8 slab tables moved with the Lifting Fork 1.75 t / 8.0 m.
  • PD 8: With the PD 8 Lifting Unit, the slab tables are moved with the crane.
    With the PD 8 Lifting Unit, the slab tables are moved with the crane.

Related Products

Download

See our brochure below

Projects

Interested in using PD 8 for your project?

Call us on +971 (0) 4 326 2992 to discuss your requirements further.