CB Climbing Formwork in action
Your benefits at a glance-
Large scaffold units
with simultaneous high load assumptions through the high loading capacity of the brackets.
-
Time-saving moving procedure
of the securely assembled units consisting of platform and formwork in only one crane lift.
-
Free of tripping hazards
in front of and behind the formwork as the platform lining is placed over the brackets (valid for CB 240).
Variations
CB 240 Climbing Formwork
Bracket width 2.40 m with carriage (75 cm retraction distance), strongback and an adjustable brace
CB 160 Climbing Formwork
Bracket width 1.60 m with adjusting unit, strongback and adjustable brace
Interested in using CB Climbing Formwork for your project?
Call us on +971 (0) 4 326 2992 to discuss your requirements further.