Zahid Business Park 3

PERI in the press

Here you can read all of our latest news and press releases.

 

Latest News & Releases

    19
     
    Apr
    Danjiang Bridge over the Tamsui River in Taipei
    Danjiang Bridge Pylon
    Construction of the pylon

    press article

    Above water and clouds: Danjiang Bridge reaches record-breaking proportions with PERI Systems

    The Danjiang Bridge over the Tamsui River on the outskirts of Taipei is taking giant strides towards record-breaking proportions. The structure, designed by Zaha Hadid, is expected to be the world’s longest asymmetric cable-stayed bridge upon completion in 2025, at an impressive 920.00 metres.
    28
     
    Mar
    An outpouring of joy: More than 200 children from Kiberia celebrated new prospects for the future at the opening ceremony.
    The new PERI school building in Kibera consists of several thousand TwistBlocks.
    The TwistBlocks are hollow concrete blocks that can be slotted together without mortar to form a wall. The building blocks are produced particularly easily and quickly using specially developed formwork, namely the TwistBlock moulds from PERI.

    press article

    Opening of new school in Kenyan slum: The very first PERI school provides opportunities for the future

    In Kenia wurde die erste Schule im Rahmen des PERI Nachhaltigkeitsprogramms feierlich eröffnet

    The very first PERI school in Kenya opened its doors at the end of February 2024 for over 200 children. In Kibera, the largest slum in Nairobi, the first school in the PERI sustainability initiative “Building Sustainability” was built in less than a year. In collaboration with the non-profit start-up “Start Somewhere”, PERI developed what are known as TwistBlock Moulds for hollow concrete blocks, which were designed specifically for use in slums due to the simple and flexible manner in which they can be used. The new school building has created not only learning spaces, but also new local job opportunities.
    20
     
    Mar
    PERI is member of buildingSmart International
    Since 1 March 2024, PERI SE has been a member of the global umbrella organisation for openBIM - buildingSMART International.
    buildingSMART summit

    press article

    PERI is a member of buildingSMART International

    • PERI SE is a member of buildingSMART International and in local chapter buildingSMART Deutschland • Common openBIM approach for formwork and scaffolding construction • Design and implementation of openBIM in the construction process
    13
     
    Feb
    Major technical calculations had to be carried out to construct the complex apex of the building. All framework conditions had to be considered – from wind and weather to the safety of the workers on the scaffolding and passers-by.
    The rail-guided climbing formwork scored points with its hydraulic drive, large climbing units, high lifting force and rapid processes, which meant that a concreting cycle of just one week per storey could be achieved.
    It took PERI Denmark’s engineers more than 400 hours of work and calculations to create the final customised solution, which, according to the company, was the largest scaffold constructed at this height in Denmark at the time.

    press article

    Award for Denmark’s tallest residential building

    The “Lighthouse 2.0” construction project has created new living space with 381 new flats in the purpose-built district of “Aarhus Ø”, not far from the centre of the city of the same name. With its impressive height of 142 metres, the building has been the tallest residential building in Denmark since its completion in 2022. The top floors are home to a restaurant and a roof terrace that is open to the public – with fantastic views of the harbour, the sea and the city. The project has now received an award for the “Best Tall Building” in the “100 to 199 metres” category from non-profit organisation, the “Council on Tall Buildings and Urban Habitat” (CTBUH).
    02
     
    Dec

    press article

    Customised formwork carriage cuts construction time by several months

    At the south end of Frankfurt Airport, Terminal 3, with its futuristic design, is currently one of Europe’s largest infrastructure projects. Upon completion of construction in 2024, up to 19 million travellers will be able to arrive at and depart from the three new gates each year. PERI assisted Max Bögl with the construction of the drive-by platform, which will in future provide passengers with direct access to the departure level of Terminal 3. 
    22
     
    Nov
    PERI is now reflecting on a very successful trade fair, having showcased numerous innovations from the formwork and scaffolding sector, and held exciting talks and discussions.
    With more than 200,000 guests, the PERI exhibition hall at bauma 2022 was a visitor magnet.
    The experts from PERI provided insight into the future of the tried-and-tested MAXIMO Panel Formwork, which is impressive in terms of efficiency and sustainability.

    press article

    PERI is reflecting on a successful bauma 2022

    With more than 200,000 visitors, the PERI exhibition hall at bauma 2022 was a visitor magnet. PERI is now reflecting on a very successful trade fair featuring numerous innovations from the formwork and scaffolding sector as well as exciting talks and discussions. In addition to a comprehensive facelift for the MAXIMO Panel Formwork, additions to the PERI UP Scaffolding Kit and ground-breaking key digital technologies, PERI showcased alternative and sustainable construction methods using MESH technology and TwistBlock Moulds.
    24
     
    Oct
    The modular PERI UP Facade Scaffold now has an even higher load-bearing capacity and offers greater flexibility thanks to the EVOTOP series. In addition to the introduction of further sophisticated standard assemblies, a significantly reduced number of components and ties is a major advantage in use.
    Thanks to the EVOTOP series from the PERI UP Scaffolding Kit, even wider, longer and higher facade scaffolds can be built in demanding load classes. Heavy and inflexible frames are therefore no longer required in facade scaffold construction.
    PERI UP Cladding is a newly conceived, flexible enclosure system that is the perfect addition to the PERI UP Scaffolding Kit. It helps in providing a spatial enclosure for the construction site, while being an easy-to-install and translucent shield for the construction site personnel and the surrounding area.

    press article

    Achieving success in the scaffolding trade with PERI innovations

    With the motto “Shaping the future”, the PERI exhibition hall will open its doors on the open-air site North (booth FN 719) from 24 to 30 October 2022 in Munich. A number of innovations that make scaffolding construction quicker, safer and more economical will be showcased. Something that is always at the heart of PERI’s developments is the long-term and sustainable success of the scaffolding contractor.
    24
     
    Oct
    Digital solutions from PERI have their finger on the pulse and help companies actively counteract the shortage of skilled workers in the construction industry. They create more ergonomic, cleaner and safer working conditions with automated work processes.
    The innovative MESH technology is among the finalists in the digitalisation category of the bauma Innovation Award. The MESH technology makes it possible to produce complex or curved reinforcement cages, which in the past were manufactured with elaborate manual work, through an automated prefabrication process. (Photo: MESH AG)
    With the MESH technology, complex reinforced concrete components can be created entirely without formwork.
(Photo: MESH AG)

    press article

    Shaping the future: PERI presents innovative technologies for more efficiency

    With the motto “Shaping the future”, the PERI exhibition hall will open its doors on the open-air North site (Booth FN 719) at bauma 2022 in Munich from 24 to 30 October 2022. In addition to innovations from the formwork and scaffolding sector, PERI will present digital technologies for the construction projects of tomorrow. Visitors can look forward to a variety of digital planning tools, innovations in PERI InSite Construction sensor technology, the new myPERI Customer Portal and a live demonstration of 3D Construction Printing. The MESH technology, which is among the finalists for the bauma Innovation Award, is celebrating its première.
    24
     
    Oct
    With the motto “Building Sustainability”, visitors can experience first hand how sustainability is promoted at PERI during their visit to the trade fair.
    Visitors to the PERI exhibition hall can look forward to a comprehensive facelift for the tried-and-tested MAXIMO Panel Formwork.
    PERI will present further additions to the tried-and-tested MAXIMO Panel Formwork at the bauma. The MAXIMO Shaft Corner is being supplemented by a new striking module that saves energy and enables efficient striking of the shaft corners.

    press article

    Shaping the future: PERI presents innovations for the construction industry at bauma

    With the motto “Shaping the future”, the PERI exhibition hall will open its doors on the open-air North site (booth FN 719) at bauma 2022 in Munich from 24 to 30 October 2022. With a facelift of the tried-and-tested MAXIMO Panel Formwork, innovations from the slab formwork sector as well as new digital and disruptive technologies, such as the PERI InSite Construction sensors, 3D Construction Printing and the MESH technology, the formwork and scaffolding manufacturer is preparing the construction industry for the construction site of tomorrow. In addition, visitors can experience first-hand how the topic of sustainability is promoted at PERI with many practical examples.
    29
     
    Sep
    ONE by CA Immo, Frankfurt am Main, Germany - Project-specific PERI solution for new Frankfurt skyscraper

    press article

    Project-specific PERI solution for new Frankfurt skyscraper

    At a height of around 190 m, the new 49-storey office and hotel tower ONE by CA Immo is an integral part of the skyline of Frankfurt’s metropolis on the River Main. The skyscraper attracts attention in particular due to its triangular cantilever on the 33rd floor, which is visually reminiscent of the number “1” and lends the building its name.
    10
     
    Aug
    The 85 m high and 485 m long Filstal Bridge brings together all the challenges of bridge construction: a sophisticated construction method with slender superstructures and high bridge piers that widen in a Y-shape at the crown, high architectural concrete requirements and a narrow time window to meet the completion deadline.
    The cantilevered parapets on the west bridge were constructed in 24-m-sections using a total of four VARIOKIT Cantilevered Parapet Carriages.
    PERI engineers assisted with the construction of the piers, superstructure and tunnel portals using their solution expertise and modular, coordinated formwork and scaffolding systems.

    press article

    Building bridges with solution expertise and modular systems

    Customer-oriented planning and services combined with coordinated modular systems form the basis for developing formwork and scaffolding solutions that are suitable for almost any site requirements, including complex infrastructure projects. Experienced PERI engineers assisted with the construction of the Filstal Bridge, bringing their extensive solution expertise to bear.
    21
     
    Jul
    Robotic automated production of reinforcement cages in Zurich.
(Photo: MESH AG)
    Filling the reinforcement cages with a Sika unique concrete formulation.
(Photo: PERI SE)
    Demonstrator object near PERI Headquarter in Weissenhorn, Germany. Shows the finished highly complex reinforced concrete structure produced with reinforcement cages without formwork.
(Photo: MESH AG)

    press article

    New technology for demanding concrete structures

    Weissenhorn/Zurich, 21.07.2022. PERI SE and Sika AG are taking a stake in the Swiss startup Mesh AG. Mesh AG has developed the world's first robot-assisted technology for the efficient and cost-effective production of complex reinforced concrete structures without formwork.
    29
     
    Jun
    In Incheon, South Korea, just a few kilometers from Seoul, two new luxury residential towers were built using the RCS MAX Rail Climbing System.
    The two buildings each comprise 40 stories and are 143 m high. They provide space for a total of 351 residential units.
    With the help of the RCS MAX Hydraulic Unit, malfunctions were quickly and easily detected via light signals on the hydraulic unit as well as the indication on the display.

    press article

    Synchronous climbing of all platforms: First use of the RCS MAX in South Korea

    Only a few kilometres away from the South Korean capital Seoul, two new 140 m high luxury residential towers were built under strict safety requirements and within a tight construction time. PERI met the demand for efficient construction as well as low personnel costs with the new and innovative RCS MAX Rail Climbing System. A premiere, because RCS MAX was used here for the first time on South Korean soil.
    28
     
    Jun
    PERI patented the guardrail in advance as early as 1996; the principle of integrated safety is still an essential component of the PERI UP Scaffolding Kit today. This is also shown, for example, by the integrated lift lock of the decks without additional components.
    Visitors to the PERI exhibition hall can look forward to realistic exhibits – including a segment of the PERI UP weather protection roof.
    Working platforms and access solutions from the combination of PERI UP and VARIOKIT can easily be integrated into existing structures and various PERI systems. The scaffolding manufacturer will be demonstrating how this works at bauma.

    press article

    PERI shows the future of scaffolding at bauma

    From 24 to 30 October 2022, the PERI exhibition hall at the northern open-air site (booth FN 719) in Munich will have the motto “Shaping the Future”. In addition to impressive exhibits, live demonstrations, personal discussions and information events, the scaffolding and formwork manufacturer will have many more surprises in store for visitors. Among other things, PERI will be showing completely new innovations for scaffolding as well as further developments of the digital planning tools.
    28
     
    Jun
    With PERI InSite Construction (ISC), PERI is presenting a sensor portfolio that optimally supplements common formwork systems. The sensor technology comes into play exactly where highly qualified workers and many years of concreting experience are in short supply. It provides support in making informed decisions about the concreting process.
    Visitors to the PERI exhibition hall can look forward to an innovative further development project from the wall formwork sector which will make the erection of walls even more economical, faster and safer in the future. PERI is also presenting new additions to the proven MAXIMO Panel Formwork.
    The SKYMAX construction kit principle with panels made of aluminium and polymer achieves a very high level of technical and economic flexibility. The lightweight polymer panels with a particularly durable formlining represent a sustainable alternative to conventional timber solutions; their use can counteract the extreme developments on the global timber market and the corresponding long delivery times.

    press article

    PERI focuses on sustainability and future viability with innovations at bauma

    From 24 to 30 October 2022, the PERI exhibition hall at the northern open-air site (booth FN 719) in Munich will have the motto “Shaping the Future”. In addition to impressive exhibits, live demonstrations, personal discussions and information events, the formwork and scaffolding manufacturer will have many more surprises in store for visitors. For example, PERI will be showing innovative further developments in the wall formwork sector as well as sustainable and digital additions for slab formwork systems.
    28
     
    Jun
    With a wide range of digital services and products, PERI supports its customers on the way to the digital future of construction and will be presenting numerous solutions at bauma 2022 that provide support during various project phases.
    With PERI InSite Construction (ISC), PERI is presenting a sensor portfolio that optimally supplements common formwork systems. The sensor technology comes into play exactly where highly qualified workers and many years of concreting experience are in short supply. It provides support in making informed decisions about the concreting process.
    Visitors to the trade show can try out PERI’s software and tools and digitally experience project examples in an exchange with experts. In this way, interested parties will have the opportunity to immerse themselves in extended reality directly on site or get to know the extended planning possibilities of the various apps.

    press article

    PERI shows innovative solutions for the construction site of tomorrow at bauma

    From 24 to 30 October 2022, the PERI exhibition hall at the northern open-air site (booth FN 719) in Munich will have the motto “Shaping the Future”. In addition to impressive exhibits, live demonstrations, personal discussions and information events, PERI will have numerous other surprises in store. This will allow visitors to experience the comprehensive digital service and product portfolio as well as disruptive technologies at first hand.
    28
     
    Jun
    The RCS MAX Hydraulic Unit as well as the RCS MAX Drive Rails can be easily combined with existing RCS material to optimise the performance of the system.
    Complete monitoring of the climbing process is possible by light signals on the RCS MAX Hydraulic Unit and by the display.
    Whether in building construction, dam, pier head or tunnel construction – with the pre-assembled platforms, the SCS Climbing System is quickly ready for use in a wide range of applications. The particularly high load-bearing capacity ensures rapid construction progress with few climbing sections.

    press article

    PERI at bauma: Innovative solutions for civil engineering

    From 24 to 30 October 2022, the PERI exhibition hall at the northern open-air site (booth FN 719) in Munich will have the motto “Shaping the Future”. In addition to impressive exhibits, live demonstrations, personal discussions and information events, the formwork and scaffolding manufacturer will have many more surprises in store for visitors. Among other things, PERI will be showing innovations from the climbing formwork sector as well as further developments for civil engineering.
    18
     
    May
    During the construction of the new faculty at the Mohammed VI Polytechnic University in Morocco, an optimally coordinated PERI formwork and scaffolding solution allowed construction to be completed within a nine-month period, while maintaining high safety standards.
    With the help of ALPHADECK Slab Formwork, it proved possible to form around 120,000 m2 of slab in just nine months.
    The low weight of the ALPHADECK panels and the possibility of early striking using the drophead system reduced the material quantities required on site and minimised the time required for work processes.

    press article

    PERI enables nine-month construction period while maintaining high safety standards

    PERI supported the construction of the new campus of the Mohammed VI Polytechnic University (UM6P) in Rabat, Morocco. With reliability and customer focus, PERI managed to meet the tight construction deadline of only nine months and helped to ensure that the project was carried out according to strict safety standards. For this construction project, PERI used a just-in-time approach to supply a comprehensive overall solution from a single source, including the new ALPHADECK and HANDSET Alpha Panel Formwork as well as PERI UP Scaffolding solutions.
    11
     
    Apr
    Refurbishment of GSH Bahnhofplatz 2
    7.5 m bridging structure with SLS Spindle fixed to steel construction platform. The connection to the eyelet on the landing platform was carefully planned with the help of a 3D planning system. The height of the landing platform and length of the RCS Rails came together with millimetre precision.
    The sandstone frescoes, which are over 100 years old, could be accessed easily for restoration purposes. Internal console brackets are fitted without the need for couplings in short, simple assembly sequences, thanks to the gravity lock ledger.

    press article

    Mega Scaffolding Kit comes into its own in the heart of Zurich

    Construction management firm Wanner + Fankhauser AG was responsible for planning and overseeing the general refurbishment of Bahnhofplatz 2 in Zurich. The building, built around 1890, was completely hollowed out with the exception of the steel beams, which were still intact.
    13
     
    Jan
    For the construction of the three bridges WS 49, WS 52 and WS 54, PERI supplied an optimally coordinated formwork and scaffolding solution based on the VARIOKIT Incremental Launching Facility, VARIO GT 24 and TRIO Column Formwork and the PERI UP Scaffolding System.
    For the construction of the three bridge structures with two superstructures each, a complete PERI solution with the VARIOKIT Incremental Launching Facility proved to be the key to success and was greatly appreciated due to reduced material quantities and time-saving handling.
    The flexible VARIOKIT Formwork Units could be individually adapted to suit the supporting construction and bridge geometry.

    press article

    Adherence to the weekly cycle with PERI VARIOKIT VIL Incremental Launching Facility

    The Expressway S3 in western Poland, with a total length of 480.70 km, runs in a southerly direction from the port of Świnoujście to the border between Poland and the Czech Republic. PERI provided support for the section between Legnica and Lubawka. For the construction of the three bridge structures with two superstructures each, a comprehensive PERI solution with the VARIOKIT Incremental Launching Facility proved to be the key to success and was greatly appreciated due to reduced material quantities and time-saving handling.
    02
     
    Nov
    Austria’s first 3D-printed building is being constructed in Hausleiten, Lower Austria. Construction technology group STRABAG, together with PERI, the formwork and scaffolding manufacturer and a pioneer in 3D concrete printing, is realising a roughly 125 m² office building next to its asphalt mixing plant in Hausleiten.

    press article

    PERI and STRABAG print first building in Austria

    Austria’s first 3D-printed building is being constructed in Hausleiten, Lower Austria. Construction technology group STRABAG, together with PERI, the formwork and scaffolding manufacturer and a pioneer in 3D concrete printing, is realising a roughly 125 m² office building next to its asphalt mixing plant in Hausleiten. The pure printing time for the building extension is approx. 45 hours. The special dry mortar for the construction 3D printing project "Tector Print", with long workability and good pumpability, is being supplied by Lafarge.
    28
     
    Oct
    Jürgen Voss will become Chief Financial Officer (CFO) of the PERI Group on 1 January 2022.

    press article

    Jürgen Voss appointed new Chief Financial Officer at PERI

    Jürgen Voss will become Chief Financial Officer (CFO) of the PERI Group on 1 January 2022. He takes over this position from Christian Schwörer, who had held it on a transitional basis since 1 May 2021 in addition to his role as Chairman of the Executive Board (CEO).
    26
     
    Oct
    Within a 16-month construction period, almost 97,500 m<sup>2</sup> of formwork solutions were used – including customised PERI special formwork elements.
(Photo: Thilo Ross)
    The results of using the highest quality architectural concrete class SB 4 and the finest white concrete are visible in the many architectural highlights: Spectacularly twisted tree-like supports, creatively patterned facade prefabricated concrete elements and sharp-edged beams in a radial pattern.
(Photo: Thilo Ross)
    The three groups of tree-like supports tower over three storeys in the foyer. PERI developed a highly complex 3D special formwork made of steel elements with an overall height of 150 mm, which consisted of 63 individually designed and CNC laser-cut individual parts.
(Photo: Thilo Ross)

    press article

    PERI assists with the construction of the new headquarters of HeidelbergCement

    Highest architectural concrete quality and extraordinary architecture: The new group headquarters of the building materials manufacturer HeidelbergCement is stunning with its bright, light-flooded rooms and the radial elements made of white concrete. Within a 16-month construction period, almost 97,500 m2 of formwork solutions were used – including customised PERI special formwork elements.
    07
     
    Sep
    The ISC Temperature Sensor Cables continuously measure the temperature of the concrete. The ISC Temperature Sensor Cables are very easy to install: They are installed in the reinforcement prior to the concreting process.
    To transmit measured values, the sensors are then connected to an ISC Temperature Sensor Node.
    The ISC Temperature Nodes can be affixed almost anywhere, for example to the formwork or a guardrail.

    press article

    Optimised concreting processes by measuring the concrete temperature and maturity with PERI sensors

    With PERI InSite Construction, PERI is bringing various digital solutions to market that optimise the concreting process on the construction site and help to save time and cut costs. The key: a measuring device, a cloud and the sensors themselves. These include the PERI InSite Construction Temperature Monitoring and Concrete Maturity Kit for efficient measurement of the temperature and determination of the maturity of the concrete.
    06
     
    Aug
    The 160 m long tunnel was cast monolithically in a total of nine sections – with only one VTC Tunnel Formwork Carriage.
    With a customised VTC Tunnel Formwork Carriage, consisting of standard components from the VARIOKIT Engineering Construction Kit in combination with GT 24 Girders and Battens in different lengths, the project requirements could be met.
    In total, the tunnel was cast in nine concreting sections, each 17 m long and 8 m high. The combination of concreting sequence and the high speed of the VTC System helped to save a full ten days per cycle.

    press article

    VARIOKIT VTC Tunnel Formwork Carriage supports construction of Werrington Grade Separation tunnel

    For the construction of the Werrington Grade Separation tunnel, the VARIOKIT VTC Tunnel Formwork Carriage and other PERI standard components were used for a solution which, despite its rectangular structure, delivered a curved result. Optimally coordinated formwork and scaffolding solutions from a single source, as well as clever advance planning services, ensured that the project ran smoothly.
    25
     
    May
    State-of-the-art, BIM-based scaffold planning and innovative PERI systems were instrumental in the construction of the new vitamin A complex at BASF SE in Ludwigshafen, Germany.
    At peak times, up to 1,300 t of PERI system material were in use on a daily basis.
    The 30-m-high heavy-duty platforms and a bridging construction on the northern side of the building proved to be challenging aspects of the PERI scaffolding solution.

    press article

    A modern approach to planning and work operations in industrial scaffolding construction

    In the industrial environment more than anywhere else, process and operational reliability requirements are particularly stringent. At BASF SE in Ludwigshafen, Germany, PERI has demonstrated that safety and cost-effectiveness can be combined with ease by making use of state-of-the-art, BIM-based scaffold planning and innovative systems.
    13
     
    Apr
    Numerous PERI systems were used during the construction of what is currently the deepest diving pool in the world with a depth of up to 45.50 metres. (Photo: Irena Stangierska)
    Deepspot is divided into two areas, the main section with a depth of 15.50 m and an additional diving tube with a total depth of 40.50 m, which connects to the main area at one edge of the pool.
(Photo: Irena Stangierska)
    ST 100 Stacking Towers were used to support the underwater viewing bridge. For reasons of statics, these could only be dismantled when the diving pool was already filled with water. Professional divers were deployed.
(Photo: Irena Stangierska)

    press article

    Diving in Poland: PERI constructs the deepest diving pool in the world

    Far away from the world's well-known diving paradises, the Polish city of Mszczonów has become home to what is currently the deepest diving pool in the world. Numerous PERI systems were used for the construction of the pool, which has a depth of up to 45.50 metres. The special highlight was the dismantling of the ST 100 Stacking Towers used: for reasons relating to the static requirements, the stacking towers could only be dismantled after the pool had been filled with water – not by the company's own construction site staff, but by specially trained divers.
    24
     
    Feb
    Čortanovci Viaduct, Novi Sad, Serbia: The two-lane superstructure in section C was realised in only five cycles using MULTIFLEX Girder Slab Formwork.
    Čortanovci Viaduct, Novi Sad, Serbia: PERI UP supported the MULTIFLEX Girder Slab Formwork with a support height of up to 20.00 m.
    Čortanovci Viaduct, Novi Sad, Serbia: In section B, the ALPHAKIT Shoring Construction Kit was chosen specifically because it is designed for a support height of up to 30.00 m.

    press article

    Clear the way for the new Čortanovci Viaduct on the Budapest-Belgrade high-speed line

    The Budapest-Belgrade line is part, and the first stage, of the planned international railway connection Budapest-Belgrade-Skopje-Athens and is currently one of the largest investment and infrastructure construction sites in the eastern part of Europe. PERI supported the construction of the Čortanovci Viaduct on the Serbian section between Stara Pazova and Novi Sad - and in addition to intensive on-site support, also provided cleverly combinable system solutions based on the modular principle.
    08
     
    Jan
    City Palace Humboldt Forum, Berlin: PERI supplied economical formwork and scaffolding solutions from a single source for the reconstruction of the Berlin City Palace. In addition to fast shuttering and repositioning times, the on-site project support provided by the PERI engineers ensured that the very tight construction schedule could be adhered to.
    City Palace Humboldt Forum, Berlin: Due to the PERI solution with external CB Climbing Platforms, no facade scaffolding was required for the shell construction. For the round reinforced concrete walls of the dome, RUNDFLEX Circular Wall Formwork was used together with FB 180 Folding Platforms.
    City Palace Humboldt Forum, Berlin: The planning and supply of formwork and scaffolding from one source created a synergistic effect for the site management team.

    press article

    Concrete and baroque: formwork and scaffolding for Berlin's Humboldt Forum

    With the Humboldt Forum, a centre of art, culture, science and education opened in the historic centre of Berlin in December 2020. PERI supplied a large quantity of economical formwork and scaffolding solutions from a single source for the reconstruction of the Berlin City Palace. In addition to this well thought-out overall solution, the project support provided by PERI engineers during construction ensured that all requirements were met and the construction schedule was adhered to.
    15
     
    Dec
    Pasteurs Tower, Copenhagen, Denmark: In the heart of Copenhagen, Pasteurs Tower, a 120-metre apartment building is being built, which will be the highest apartment building in Copenhagen when it is completed in 2022.
    Pasteurs Tower, Copenhagen, Denmark: The lowering head of the SKYMAX Large Panel Slab Formwork in combination with the MULTIPROP Aluminium Slab Props allowed fast formwork insertion and removal and resulted in the 6-day cycle being maintained.
    Pasteurs Tower, Copenhagen, Denmark: The RCS Rail Climbing System helped to minimise crane operating times and was also the comprehensive solution from PERI.

    press article

    Première of SKYMAX Large Panel Slab Formwork at the construction of Pasteurs Tower in Copenhagen

    In Carlsberg City, a district in the heart of Copenhagen, a completely new neighbourhood is being built. Several high-rise buildings are currently under construction there, and Pasteurs Tower will be the highest residential building in Copenhagen upon completion. Flats will be built on 33 of the 37 floors, and commercial enterprises will be located on four floors. PERI supported the project with a variety of formwork solutions. The special highlight: The first use of SKYMAX Large Panel Slab Formwork.
    02
     
    Nov
    The Kennedy Center is the largest arts centre in the American capital. The extension project “The REACH” has seen the construction of three additional buildings at the centre.
(Photo: Cowles Graphic Design)
    The three pavilions were built with architectural concrete of the highest quality.
(Photo: Cowles Graphic Design)
    The extension consists of the Welcome Pavilion, the River Pavilion, and the Skylight Pavilion.
(Photo: Cowles Graphic Design)

    press article

    PERI Architectural Concrete Project “The REACH” wins ACI Overall Excellence Award

    The building extension at the imposing Kennedy Center for the Performing Arts is commonly known as “The REACH”. It comprises three interconnected pavilions that stand out due to their exceptional architectural design and architectural concrete of the highest quality. The larger-than-life project won the American Concrete Institute’s Overall Excellence Award in October 2020 and is thus recognised as a project that unites particularly creative techniques with innovative technologies. For this special construction project, PERI developed a formwork concept that combined tried-and-tested standard systems with project-specific solutions. 
    29
     
    Sep
    PERI prints first residential building in Germany with portal printer BOD2 in Beckum (North Rhine-Westphalia)
    PERI 3D-construction printing process

    press article

    PERI builds the first 3D-printed residential building in Germany

    PERI GmbH is building Germany’s first 3D-printed residential building in Beckum, North Rhine-Westphalia. The two-storey detached house with approx. 80 sqm of living space per floor is not being constructed in the conventional manner, it is being printed by a 3D construction printer.
    09
     
    Sep
    TrIIIple, Vienna, Austria: Thanks to a competent support service and well-thought-out system utilisation, PERI is successfully constructing the complex building geometry, which is subject to stringent requirements.
    TrIIIple, Vienna, Austria: The building is depicted using BIM 360° Field even before construction begins.
    TrIIIple, Vienna, Austria: The VST Heavy-Duty Shoring Towers are secured to the building by retaining structures. The surface-mounted distribution platform serves to accommodate the PERI UP scaffolding.

    press article

    Project-specific solutions using unique combination of formwork and scaffold systems

    Thanks to a competent support service and well-thought-out system utilisation, PERI is successfully constructing the complex building geometry of the three TrIIIPle residential towers on the Danube Canal in Vienna, which is subject to stringent requirements. Safe working processes, optimised construction site logistics and cost-effective solutions see demanding building schedule adhered to.
    03
     
    Aug
    Air traffic control tower, Buenos Aires-Ezeiza Airport, Buenos Aires, Argentina: The new air traffic control tower at Buenos Aires-Ezeiza Airport reaches a height of 108.40 m and provides a 360° field of vision over the entire airport complex.
    Air traffic control tower, Buenos Aires-Ezeiza Airport, Buenos Aires, Argentina: The air traffic control centre starts at a height of around 62 m and consists of five self-supporting platforms.
    Air traffic control tower, Buenos Aires-Ezeiza Airport, Buenos Aires, Argentina: The customised project solution was based on two compatible PERI Modular Construction Systems: VARIOKIT combined with PERI UP.

    press article

    Keeping an eye on everything: a new control tower for Buenos Aires-Ezeiza Airport

    With a total surface area of around 7,000 m², a height of 108.40 m and a 360° field of vision over the airport complex, the new air traffic control tower at Buenos Aires-Ezeiza Airport provides the basis for optimised visual monitoring and control of air traffic. PERI assisted with the complex construction work by providing tailor-made special-purpose formwork, closely coordinated formwork and scaffolding solutions, and much more.
    01
     
    Jul
    Terfener Innbrücke, Terfens, Austria: The Terfener Innbrücke, which measures roughly 235 m in length, is situated on the A12 motorway in the Inntal valley in Tyrol. (Photo: Günther Bayerl)
    Terfener Innbrücke, Terfens, Austria: The project was carried out using the balanced cantilever construction method and the VBC Balanced Cantilever Carriage. The rentable system components of the VARIOKIT Engineering Construction Kit provided the basis for this. (Photo: Günther Bayerl)
    Terfener Innbrücke, Terfens, Austria: With the VBC Balanced Cantilever Carriage, it was possible to complete 5.70-m-long concreting sections on a weekly basis. (Photo: Günther Bayerl)

    press article

    Reconstruction of the “Terfener Innbrücke” bridge on the A12 motorway in Austria’s Inntal valley

    The Terfener Innbrücke reconstruction project on the A12 motorway in the Inntal valley is one of largest bridge construction projects currently being carried out in the west of Austria. With PERI by their side, the client has been successful in implementing the project according to the demanding construction schedule since construction began in 2018. In addition to providing comprehensive planning services and on-site support during the project, PERI has also made use of the VBC Balanced Cantilever Carriage for the first time in Central Europe.
    04
     
    May
    PERI has delivered around 480 tonnes of formwork and scaffolding material to the client’s construction site in addition to providing comprehensive on-site support.
    On account of the subterranean position up against the ground earth, it was not possible to use end-to-end formwork ties when concreting the retaining walls. For this reason, a single-sided formwork solution was required.
    The columns were formed in a straightforward manner without any special-purpose components thanks to the integrated perforated strips on the LIWA Panel Formwork.

    press article

    Bandra Kurla Complex (BKC): PERI assists with the construction of Asia’s largest underground station

    The Bandra Kurla Complex (BKC) is an underground station on the Mumbai Metro, a rapid transit system that is currently under construction. The rapid transit system in the Indian metropolis will serve the city of Mumbai itself as well as its entire metropolitan area in the federal state of Maharashtra. By supplying comprehensive formwork and scaffolding solutions, PERI has been providing assistance since construction began on the major project in April 2019 so that the BKC can be completed within the demanding construction time-scale of only 14 months.
    01
     
    Apr
    The gas compressor platform CA-KU-A1 was erected at the shipyard of Dragados Offshore in Tamaulipas/Mexico with the aid of comprehensive PERI scaffolding solutions.
    CA-KU-A1 has a weight of 23,900 tonnes and can compress around 450 MMcf of sour gas per day.
    It was possible to adapt the suspended working platforms variably in 25 cm increments to account for the gaps between the steel girders. Scaffold tubes and couplings were used to fix them to the steel girders of the platform.

    press article

    New platform for the Mexican oil and gas field Ku-Maloob-Zaap

    The oil and gas field Ku-Maloob-Zaap (KMZ), which covers a total area of around 121 km², is situated in the bay of Campeche, 105 km north-east of the city of Ciudad del Carmen. In 2019, a new gas compressor platform named CA-KU-A1 was added to the oil and gas production complex that is located there. To carry out the time-critical construction project, PERI provided flexible scaffolding solutions and comprehensive on-site support. 
    02
     
    Mar
    The sustainable residential complex GIOIA 22 is situated at the heart of the Porta Nuova district of Milan and, upon completion, will cover 65 percent of its annual energy requirements using renewable energy sources. (Photo: Alberto Brevi)
    A characteristic feature of the building is its folded shape. It consists of a main core and secondary core. To achieve this, the first RCS Climbing Unit was installed using vertical as well as laterally inclined climbing rails. (Photo: Alberto Brevi)
    It was possible to form both the inclined and the straight columns using the SRS&nbsp;Circular&nbsp;Column&nbsp;Formwork. Using 4,000 linear metres of PROKIT improved safety levels for the personnel on the jobsite further still. (Photo: Alberto Brevi)

    press article

    Innovative and sustainable: PERI assists with the construction of the office complex GIOIA 22, Milan

    GIOIA 22 is setting new benchmarks in terms of sustainability: the 120 m tall tower at the heart of the Porta Nuova district will cover 65 percent of its annual energy requirements using renewable energy sources. The 30 storey tall building will provide enough space for approximately 2,700 people, 350 parking spaces and 13 lifts. PERI provided support during the construction process of this inventive project using a combination of tailor-made formwork and climbing solutions.
    07
     
    Feb
    The principle of the innovative SKYMAX formwork solution is based on compatible components made of various materials. The result of this is a construction kit that paves the way for flexible solutions that will fulfil specific project requirements.
    Working with the SKYMAX system is remarkably simple due to the low number of different components. The system of combining the panels and heads is self-explanatory.
    The panel slab formwork can be installed safely and efficiently from the level below. The slab panels are slipped into the head from the installation surface below and pivoted upwards.

    press article

    Groundbreaking innovation for slab formwork procedures

    The safety requirements imposed on slab-forming procedures are becoming an increasingly significant issue. At formwork and scaffolding manufacturer PERI, ensuring safety during day-to-day work is priority number 1. PERI has unveiled the future-proof large panel formwork system SKYMAX, a groundbreaking innovation for formwork systems. Not only does the innovative principle significantly increase safety levels for users, it also improves the degree of economic efficiency.
    03
     
    Feb
    The Al Bustan Street South construction project is one of four parts that make up the Sabah Al Ahmad Corridor infrastructure project and features bridges with a total length of more than 10 km.
    The PERI system solution was tailored to account for the specific circumstances on site as one of the great challenges of the project was to carry out the construction work without causing major disruption to traffic.
    Combining the modular VARIOKIT and PD 8 systems proved to be the ideal approach to establishing the superstructure formwork for the in-situ concrete bridge. PD 8 shoring, which was adjusted quickly and steplessly to the different heights, ensured that loads could be transferred in an optimum manner.

    press article

    Demanding infrastructure project underway in Doha

    Adherence to deadlines, efficiency and completion without interrupting the flow of traffic are the requirements that are of paramount importance during the Sabah Al Ahmad Corridor infrastructure project. For the construction phase on Al Bustan Street South, PERI made use of the PD 8 shoring system and a combination of systems from the PERI UP Flex portfolio in addition to a tailor-made VARIOKIT solution with VST heavy-duty shoring towers. The customer has therefore taken full advantage of the opportunity to procure time-saving formwork and scaffolding systems from a single source.
    03
     
    Jan
    The large-scale project, SKY PARK, is the new cultural epicentre of Bratislava – in addition to customised scaffolding solutions, PERI made use of the RCS rail climbing system in combination with VARIO GT 24 girder wall formwork during the erection of the residential complexes.
(Photo: Penta Real Estate)
    The complex planning and construction of the façade scaffolding for the three 105-metre-high elliptical residential towers was the product of a collaboration between PERI Slovakia and PERI Czech Republic.
(Photo: Penta Real Estate)
    On account of the high axial forces, a combination of different PERI scaffold systems proved to be the optimal solution for erecting the façade.
(Photo: Penta Real Estate)

    press article

    Scaffolding solutions for three residential towers in the new cultural epicentre of Bratislava

    The new cultural epicentre of the region is currently being built in Bratislava: SKY PARK is a multi-functional centre that combines a modern living and working experience with public spaces. Spanning approximately 5 hectares, the site currently encompasses three residential towers, two office buildings, a large park area and the Jurkovič thermal power station, which is being refurbished as part of this major project. In addition to customised PERI scaffolding solutions, amongst others the PERI RCS rail climbing system in combination with the VARIO GT 24 girder wall formwork was used during the erection of the residential complexes.